Project Dunaujvaros sewage plant

Imagen Proyecto Dunaujvaros sewage plant 875
Imagen Proyecto Dunaujvaros sewage plant 876
Imagen Proyecto Dunaujvaros sewage plant 877
Imagen Proyecto Dunaujvaros sewage plant 878
Imagen Proyecto Dunaujvaros sewage plant 879
Imagen Proyecto Dunaujvaros sewage plant 880

The Dunaújváros urban wastewater treatment station is a project of great impact and importance for the local community of Dunaújváros, Hungary. This facility will treat the wastewater of a population of more than 250,000 persons in the Western part of the city and will contribute to the protection of the community against waterborne diseases.

In addition, it will allow the reuse of treated wastewater and the recovery of sludge for for agricultural purposes.
The WWTP has a coarse well, an initial pumping station, pre-treatment (coarse and fine roughing and grit traps - degreasers through aerated channels), secondary treatment (prolonged aeration with nitrification-denitrification) and final disinfection of the effluent by means of chlorination. Likewise, the WWTP also has a treatment line for the sludge produced, where it is thickening by gravity and subsequent dehydration to reduce the final volume of the same.

Characteristics:
• Type: Wastewater plant
• Location: Dunaújváros (Hungary)
• Construction started: March 2016
• Estimated investment: 22.000.000 USD
• Stations: 6
• General Contractor: Veolia France

Details


The Dunaújváros urban wastewater treatment station is a project of great impact and importance for the local community of Dunaújváros, Hungary. This facility will treat the wastewater of a population of more than 250,000 persons in the Western part of the city and will contribute to the protection of the community against waterborne diseases.

In addition, it will allow the reuse of treated wastewater and the recovery of sludge for for agricultural purposes.
The WWTP has a coarse well, an initial pumping station, pre-treatment (coarse and fine roughing and grit traps - degreasers through aerated channels), secondary treatment (prolonged aeration with nitrification-denitrification) and final disinfection of the effluent by means of chlorination. Likewise, the WWTP also has a treatment line for the sludge produced, where it is thickening by gravity and subsequent dehydration to reduce the final volume of the same.

Characteristics:
• Type: Wastewater plant
• Location: Dunaújváros (Hungary)
• Construction started: March 2016
• Estimated investment: 22.000.000 USD
• Stations: 6
• General Contractor: Veolia France

Family

Basorplast

Model

BPE

Type of material

Basorplast BPE PVCM1 UV

Country

Hungary