Project Aguilas desalt plant
With a capacity of up to 210,000 m3 / day, the Águilas-Guadalentín desalination plant complements the supply of the irrigation demands of the southern area of the Segura Basin, and of supply to the municipalities of Lorca and Águilas (Spain).
The plant also has important distribution and pumping systems for different users and advanced systems for the diffusion and dissolution of brine in the sea, promoting environmental protection.
The treatment process consists of:
1st Pretreatment by means of double filtration stage (by gravity and pressure)
2nd Reverse osmosis with double pass for boron removal
3rd Energy recovery through isobaric chambers
4th Remineralization
Features:
• Type: Desalination plant
• Location: Águilas (Spain)
• Start of construction: March 2013
• Estimated investment: 228,000,000 EUR
• Stations: 12
• Contractor: TUC Ferrovial + Sacyr + Cadagua + Sadyt
Details
With a capacity of up to 210,000 m3 / day, the Águilas-Guadalentín desalination plant complements the supply of the irrigation demands of the southern area of the Segura Basin, and of supply to the municipalities of Lorca and Águilas (Spain).
The plant also has important distribution and pumping systems for different users and advanced systems for the diffusion and dissolution of brine in the sea, promoting environmental protection.
The treatment process consists of:
1st Pretreatment by means of double filtration stage (by gravity and pressure)
2nd Reverse osmosis with double pass for boron removal
3rd Energy recovery through isobaric chambers
4th Remineralization
Features:
• Type: Desalination plant
• Location: Águilas (Spain)
• Start of construction: March 2013
• Estimated investment: 228,000,000 EUR
• Stations: 12
• Contractor: TUC Ferrovial + Sacyr + Cadagua + Sadyt
Family
Basorplast
Model
BPE
Type of material
Basorplast BPE PVCM1 UV
Country
Spain